top of page
![man pointing at blueprints](https://static.wixstatic.com/media/c19c76_22d8ec47d1484b09a9c333e4141a12a0.jpg/v1/fill/w_300,h_225,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/c19c76_22d8ec47d1484b09a9c333e4141a12a0.jpg)
Mass Excavating
![background photo of general construction](https://static.wixstatic.com/media/b31d0e84cb714761b2b1f06c305023c7.jpg/v1/fill/w_300,h_225,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b31d0e84cb714761b2b1f06c305023c7.jpg)
![aerial view of site](https://static.wixstatic.com/media/9e456adff0ee4a2c847cfd67a62454a3.jpg/v1/fill/w_300,h_225,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/9e456adff0ee4a2c847cfd67a62454a3.jpg)
Industrial Construction Preparation
508-386-9258
41 Taunton Green Suite 102 Taunton, MA 02780
An 8(a)/MBE Certified Small Business
Phase II Sludge Landfill Cap
Attleboro, MA
The Work includes the cap and closure of the Phase II Sludge landfill cell, including tie into the Phase I residual cell. The Phase II landfill is approximately 5 acres in total, and is lined with a 40-mil HDPE liner. Closure construction will consist of reshaping the landfill surface, installation of the landfill capping system consisting of (top-to-bottom) an 8” topsoil layer, a 12” coarse sand drainage layer, a 40-mil textured HDPE layer, and a 6” gas venting sand layer; installation of a vegetative layer with drainage swales, passive gas piping and vents; installation of an access road and installation of a gas monitoring well.